Pump Screed: Extension, SW London

The Scenario

For this extension in Barnes, South West London, we had to pump screed for a ground floor extension.

The Solution

We pumped 5.2m3 of Cemfloor fast track flowing liquid screed.

The tiler was able to carry out his work 12-14 days after we’d pumped the screed.

Get in touch today for a FREE quotation